BLUE
C
catherineberthet.bsky.social
@catherineberthet.bsky.social
12 followers75 following70 posts

Idem mais les indices donnaient la réponse!

0

Oh punaise! Celui lĂ  je l’ai trouvĂ©!!! đŸŸđŸŸ

0
TWwashingtonpost.com

A door that blew off an Alaska Airlines plane midflight last month appears to have been been installed at a Boeing factory without four bolts needed to keep it attached, according to a report by federal investigators Tuesday.

Alaska flight that blew hole had bolts removed at Boeing facility
Alaska flight that blew hole had bolts removed at Boeing facility

FAA Administrator Mike Whitaker is expected to face tough questioning from lawmakers at a House subcommittee hearing on the agency’s oversight of Boeing.

8

Ah. Mais en fait pour des raisons bizarres d’algorithme je ne te vois plus passer dans ma TL et mes souvenirs de tes « on cherche  » remontent donc Ă  un moment. La je suis contente je te vois souvent! N’empĂȘche que le level a augmentĂ©!!!

0

T’as pas la possibilitĂ© de tout marquer comme lu (sans jeter le moindre coup d’Ɠil aux premiers histoire de pas culpabiliser ou t’embarquer dans un porte avion Ă  Ă©coper.?

0

J’en trouve jamais aucun.e T’as augmentĂ© le level sur BS!

1

Rien surtout. Enfin cette annĂ©e exceptionnellement je dĂźne avec ma mĂšre. Et je le sais parce qu’on va arriver dĂ©but de soirĂ©e dans un hĂŽtel Ă  Lille et quand j’ai dit qu’on dĂźnerait probablement sur place cause voyage fatigant pour Mummy, elle m’a suggĂ©rĂ© de rĂ©server 
 un mois a l’avance donc đŸ˜±

0

Pourrait-on mĂȘme dire que leur principe est justement de les Ă©prouver, tester, puis les valider ou infirmer ou estimer qu’elles ne signifient rien?

0
TWwashingtonpost.com

Boeing plans to rework dozens of 737 Max jets after misdrilled holes were discovered on some fuselages, marking the latest production problem for the aircraft.

Boeing finds new problem with 737 Max fuselages
Boeing finds new problem with 737 Max fuselages

Boeing plans to rework 50 jets after misdrilled holes were discovered during the production process.

7
Wwheredafukarwi.bsky.social

In the 5-year period that the max was developed engineers filed over a thousand safety concerns. During that 5-year period Boeing spent $40 billion dollars on stock buy backs.

0
C
catherineberthet.bsky.social
@catherineberthet.bsky.social
12 followers75 following70 posts