BLUE
Mkim987.bsky.social

topa jogar uma partida de asphalt 8? só precisa baixar

2

Asphalt Legends Unite Supercharged Edition for Switch Races to Store Shelves in EU Oct. 24th, 2024: https://gonintendo.com/contents/40985-asphalt-legends-unite-supercharged-edition-for-switch-races-to-store-shelves-in-eu#switch

0

They have a new edition of Asphalt and a very nice Filibus set

1
SKthedrellum.bsky.social

"This is a city of ghosts. I have walked the streets when a crowd of ghost bikes rode by, their invisible tires throwing up asphalt from a dying road." My story "You Must Cut It From You" is in issue #10 of @houseofgamut.bsky.social!

You Must Cut It From You
You Must Cut It From You

You must be logged in to read this content.  Please subscribe to view. Username Password Remember Me     Forgot Password

1
Ppero.berlin

slow down (triptych, speed bump on asphalt, mc version, 2024) #photography#blackwhitephotography#monochromephotography#streetphotography

0
DCtzed250.bsky.social

A crane truck set them in place and a crew of carpenters wove vinyl siding or asphalt shingles in at the joints on walls/roof. The sections were plumbed and wired with the electrical panels hanging down ready to be attached inside the foundations! Amazing.

1
NFn4ejchicago.bsky.social

That doesn't just mean more work and more money. It also means more pollution. And it's not evenly distributed. Most of Chicago's asphalt is produced by three plants within a radius of less than two miles on the Southwest Side. We call it The Asphalt Triangle. 10/

1
NFn4ejchicago.bsky.social

Those asphalt bids had a "health and environmental checklist" that was *check notes* two items long. City permit and state permit. MAT Asphalt submitted an unapproved permit application. 6/

Environmental and health checklist
Bidders were required to include their permits from the Chicago Department of Public Health (CDPH) and the Illinois EPA (IEPA).
MAT Asphalt submitted an unapproved permit application with no date issued or date expiring.
The lEPA confirmed that the FESOP permit application included in MAT's bid documents was never approved, and that MAT does not have a FESOP permit.
Partial image of a permit application with blank spaces next to date issued and expiration date underlined in red
1
NFn4ejchicago.bsky.social

We took a close look at asphalt contracts awarded last year. They require monthly recycled content reports to the city. The Dept of Transportation has no record of them ever being submitted. 4/

Documentation of recycled content
Contractors are required to provide a monthly report to the Department of Transportation detailing the amount of recycled materials used.
CDOT has no record of any recycled content reports.
1
NFn4ejchicago.bsky.social

Also, since 2014 city commodity contracts have included a requirement that vendors must report any citations, lawsuits, etc to the Law Department within 24 hours. The Law Dept has no record of anything ever being reported. 3/

Environmental claims must be reported immediately
Since 2014, commodity contracts have required vendors to report citations, lawsuits, or any other "environmental claim" to the Law Dept. within 24 hours.
Dept of Law has no record of any environmental claims ever being reported.
Since that requirement was added, Reliable Asphalt, Ogden Materials, and MAT Asphalt have all failed to report violations while under contract with the city.
1