B
Brad
@bradsbrown.dev
Dev (Python, mostly), dad. I read too much.
327 followers505 following831 posts
my (somewhat limited) understanding is that the relatively small DC ties can be approved by FERC without pulling the grid into federal regulation, since our synced AC grid is still entirely within state lines.my (somewhat limited) understanding is that the relatively small DC ties can be approved by FERC without pulling the grid into federal regulation, since our synced AC grid is still entirely within state lines.
B
Brad
@bradsbrown.dev
Dev (Python, mostly), dad. I read too much.
327 followers505 following831 posts