Residential/Commercial/Utility Solar Contractor, Developer, & Consultant as “Commercial Solar Guy” write for pv-magazine-USA.com 336.74 ppm www.linkedin.com/in/johnfitzgeraldweaver/
180 followers68 following415 posts

2. Fill up the system batteries (about 62 kWh worth). 3. When both #1 and #2 are met, export to the power grid - but limit the output to 50 kW. 4. If #1, #2, and #3 are being met - the inverters will cause the solar panels to "clip" (adjust settings to not turn sunlight into electricity).

1

One really nice added benefit of the system is that is it also going to be registered within the Rhode Island Energy Networked Solutions program - which means the battery will be part of the state's #energystorage peaking virtual power plant.

1
Profile banner
CS
Commercial Solar Guy
@commercialsolarguy.bsky.social
Residential/Commercial/Utility Solar Contractor, Developer, & Consultant as “Commercial Solar Guy” write for pv-magazine-USA.com 336.74 ppm www.linkedin.com/in/johnfitzgeraldweaver/
180 followers68 following415 posts